A clear line from first question to operating asset

Our process keeps the business case, engineering assumptions and field execution connected — reducing gaps between consultants, suppliers and contractors.

Six-stage project delivery process

  1. 01

    Consult

    Align the business case, site context and project objectives.

  2. 02

    Feasibility & DPR

    Validate technical viability, economics, risks and approvals.

  3. 03

    Design & Engineering

    Develop execution-ready engineering informed by applicable safety and compliance requirements.

  4. 04

    Procurement & EPC

    Control equipment, construction, quality and programme delivery.

  5. 05

    Commissioning

    Test performance, document the asset and train operators.

  6. 06

    Operations & Maintenance

    Protect uptime, yield and lifecycle performance.

Stage by stage

Every phase produces a decision or a controlled deliverable

The purpose is not process for its own sake. Each stage removes uncertainty before the next commitment is made.

01

Consult

Define the project objective, site, stakeholders, operating context and decision criteria.

  • Stakeholder brief
  • Site and data request
  • Preliminary scope
  • Decision pathway
02

Feasibility & DPR

Test technical viability, commercial logic, approvals, constraints and project risk before committing capital.

  • Site survey
  • Technical assessment
  • Financial model
  • DPR and execution plan
03

Design & Engineering

Convert feasibility assumptions into coordinated civil, mechanical, electrical and process engineering.

  • Layouts and SLDs
  • Equipment specification
  • BOQ and drawings
  • Quality and safety plan
04

Procurement & EPC

Control equipment, supply chain, installation, field quality and construction sequencing under one programme.

  • Vendor coordination
  • Construction controls
  • Inspection records
  • Progress reporting
05

Commissioning

Test the integrated system, validate performance, close documentation and train the operating team.

  • Testing records
  • As-built drawings
  • Performance validation
  • Operator handover
06

Operations & Maintenance

Protect asset availability, yield and process performance through monitoring and planned field support.

  • O&M plan
  • Preventive maintenance
  • Performance review
  • Corrective response

Start with feasibility

Start with the right first step: establish feasibility

Whether the requirement is still an idea or already has a site, we will identify the information and decisions needed to move forward responsibly.