Net Metering in India: What to Verify with Your SERC and DISCOM

Questions project owners should verify under the current state and DISCOM framework before sizing solar.

1 min read

Illustrative view of an engineer inspecting rooftop solar electrical systems

01

There is no single national project answer

Solar interconnection is implemented through state regulations and local utility procedures. Eligibility, capacity limits, metering arrangements, settlement and documentation can differ by consumer category and DISCOM.

A rule quoted for one state or tariff category should not be carried into another project without verification.

02

Verify policy before freezing system size

The commercial value of exported energy and the permissible interconnection arrangement can influence the optimal system size.

  • Consumer category and sanctioned load
  • Applicable net, gross or other metering arrangement
  • Capacity and transformer constraints
  • Application documents and technical approvals
  • Metering, inspection and commissioning process
  • Settlement treatment and billing cycle

03

Design for the current framework, retain flexibility

A feasibility study should use the current notified framework and utility process while testing how the project performs under different export assumptions. This keeps the investment decision grounded without assuming policy will remain unchanged for the full asset life.

Start with feasibility

Apply the thinking to your site

A technical briefing can frame the questions. A feasibility study answers them for your project, location and operating model.